This commercial building project included the fit out of an urgent care doctor’s office. Starting from an empty space inside an existing building.

Project details

May 2024
Albury
Connelly Construction Service
Walls assembled onsite / supply and install

Project Introduction

This was a fit-out project to convert an empty space into an urgent care facility. The build included a reception, offices, treatment rooms and staff rooms. We supplied and installed the wall frames.

Assembled Frames onsite

The job site was in an existing building with limited access. The doorways were too small to get pre-assembled wall frames through, so we had to assemble them onsite. To do this as quickly as possible we build a table onsite. The team still completed this install extremely quickly.
http://Flush%20joins%20for%20plaster%20install

Flush joins for plaster install

Our system produces walls with flat joins making them a plasterer's dream. The screw holes are dimpled in and the ends of the studs are swaged to fit neatly into the 89mm stud. T
http://light%20gauge%20steel%20beams
"I have been impressed with the prefabricated steel framing. It saves time, it’s cost relevant to timber and is very straight for plaster linings."
Dave Tucker, Connelly Constructions