Aldi Yarrawonga

Prefabricated frames were used to line the interior walls. The design included over 50LM of a bulkhead, 5m high.

Project details

October 2024
Yarrawonga, Victoria
George Rydell Construction Pty Ltd
Wall Frames and Bulkhead / supply and install

Project Introduction

The Aldi Yarrawonga project was a great opportunity to show how quickly our prefabricated frames can be installed. The entire project took one day to manufacture and 2 days to completely install. This includes a significant bulkhead running the entire distance around the store.

Fast Installation

The installation of the frames on this project took 2 days. This is less then half the time it would have taken to build from individual studs and track.

Bulkhead Solution

The project required building a bulkhead around the entire shop floor. The top is 5m high, with a height of 1.7m. Using prefabricated panels allowed us to detail around beams and lift the panels in to place. This saved significant time on site.