Elmwood Medical Centre

This commercial construction project included the installation of prefabricated walls.

Project details

November 2023
Wodonga
Connelly Construction Services
Walls / Supply and Install

Project Introduction

Medical fit out of an empty shell. We installed our 208LM of prefabricated walls in just 2 days. The walls were 2.7m, so we sectioned them no longer than 6m so they could be transported on our 6m MR Truck.

Speed of Install

Having all walls prefabricated and ready to be installed ensured the project went as smoothly and quickly as possible. We have significant yard space available to store frames, ready for installation.
http://elmwood%20medical%20centre%20project

Added Noggins into Design

Doctors' offices normally require lots of noggins to hang their instruments off. Adding noggins and bracing in the design phase means there is no need to install individual noggins onsite. This is another process we use to speed up the project program.
http://smooth%20install
“I have been impressed with the prefabricated steel framing. It saves time, it’s cost relevant to timber and is very straight for plaster linings.”
Dave Tucker, Connelly Constructions