Negative Pressure Rooms

This construction project included the installation of prefabricated walls to structural bracing.

Project details

March 2024
Albury
Joss Construction
Prefabricated Walls / Supply and Install

Project Introduction

The building is a new build on the existing Albury Hospital property. The building consists of 1 ward with rooms around the sides of the building and a hallway down the middle.

Integration with Structural Beams

There were a large amount of structural beams with cross bracing on this build. To ensure the onsite installation was as smooth as possible we designed the walls and followed with a check measure. The result was a fast install with a quality finish.
http://prefabricated%20walls

Lightweight walls can be craned in.

Due to the location of the job site materials had to be craned in. Naturally light gauge steel is lighter than timber, therefore we had the ability to move more walls in with each lift. Less crain time means less cost and a better price for the builder.
http://negative%20pressure%20room